Project Portfolio

A Selection Of Our Recent Work

Collie Olympic Swimming Pool

Wet Deck Pools at Collie Olympic Swimming Pool

Mukinbudin

New plant room fit-out including filtration, chlorination and balance tank.

Horizontal bore and new 200mm pressure line to dive well centre channel.

Kids pool supply line.

Adventure World - Kids Cove

Installation of new Whitewater tipping bucket water feature to Kids Cove.

This project is called the Splash Zone. Other items installed include: 2 x spray tunnels, 1 x giant mushroom water feature, tipping bucket water feature.

Installation of new 30kW pump in custom built plant house. All design and construct.

Adventure World - The Shotgun

Installation of new filtration system & motive pipework including Chadsons filtration. Installed hair and lint strainers plus a combination of various pumps including 2 x 30kW main slide pumps.

We also refurbished the balance tank to prevent massive water loss. Once this refurbishment was complete, the result was nil water loss.

We also installed Installation of 2 x 30kW circulation pumps for Lagoon Pool.

Trayning Shire Pool

Demolition of existing concrete gravity filter, demolition of plant room.

Construct entire new plant room with storage room for swim club.

Installation of new Chadson filtration including pumps, hair and lint pots, filters, electrical and backwash.

Wagin

Olympic pool converted to wetdeck installation of new stepped entry, installation of new ramp access, both pool heads modified and fully tiled with Anti removable start blocks to deep end.

New 200m2 custom built fully tiled childrens pool with tipping bucket water feature, fountains and bubble up with beach entry.

All new filtration system and balance tank.

Katanning Public/Olympic Pool

Installed brand new Wetdecks to the olympic pool, upgrades to pool heads, new stepped entry and new upgraded filtration.

Also built and installed a brand new 300 metre square kids pool including new water features and filtration.

Three Springs Olympic Pool Filtration Upgrade

Design & construction of new plant room including demolition of existing filter then upgraded with Chadsons filtration.

Installed five, MHS 3000 Chadsons Filters, new gear driven valves, new twin pump system, new hair lint strainers, safety shower, stainless steel sink and flick mixer and safety signage.

Oakley Grove Apartments, Erskine

New pre-cast Wetdeck components were used to construct this 18m x 5m fully tiled Wetdeck swimming pool with fountains and coloured LED lighting.

Project went extremely well utilising our new pre-cast technology saving the client time and money with a higher quality of workmanship.

Timbers Edge

Wetdeck 25m indoor heated pool.

Wetdeck indoor heated spa.

Wetdeck outdoor 200m square freeform with custom 12m infinite edging.

Ridgewood

16m x 6m fully tiled Wetdeck indoor heated pool.

Coco C'Bay Lifestyle Village, Mandurah

Constructed a 25 metre Wetdeck indoor heated pool.
Constructed elevated Wetdeck pool with waterblade feature.
Constructed wetdeck indoor mosaic tile spa.
Constructed outdoor 280m₂ Bali pool with island and spa.

Cunderdin Olympic Swimming Pool

Cut and installed fully tiled Wetdecks, cut and installed new disabled step entry.

Modifications to kids pool, installed a new 6m x 3m balance tank, new plant room and filtration upgrade, concourse brick paving.

Corrigin Olympic Swimming Pool

We concrete cut the entire gutter system off and installed fully tiled Wetdecks. The entire Olympic pool was then re-tiled.

Extensive modifications to the kids pool and plant room were also undertaken. We also converted their backwash system to a balance tank and installed a new supply of drainage lines.

The new plant room came complete with bullnose verandahs and a re-installation of the existing filtration equipment.

Other Commercial Pool Projects Include:

Harvey Olympic Swimming Pool

Modifications to filtration including upgrade and modifications to pipe work, installation of new filtration media and re-installation of main pump.

York Olympic Swimming Pool

New foot valve and general maintenance.

Morawa Olympic Swimming Pool

Replaced centre channel, repaired leaking construction joints to dive well. (Plastering outsourced)

Guildford Grammar School

Balance tank upgrade including custom modifications

Mullewa Swimming Pool

Construction of new plant room, installation of new filtration system. All associated piping and valves, new electrical and chlorination system.

Moora Kids Swimming Pool

Re-tiled kids pool

Projects for the Australian Government – Department of Defence

Wedge Island (Lancelin)

Bunker construction in firing range, remote location concrete batched on site. Fuel bund and hardstand concrete batched on site.

Pierce Air Base

Repairs to leaking control joins.

Garden Island

Bridge repairs to southern abutment high level bridge (incurred by storm damage).

Garden Island Olympic Pool

Modification of existing Wetdecks to prevent massive water loss.

Leeuwin Barracks

Tile repairs including repairs to leaking joints on existing 33 metre pool.

Fleet Base West

Wharf repairs to fleet pier after tanker collision

Bunker Construction
Garden Island Wharf Repair
Avcat Fuel Storage Facility